Projects Gallery

Some of our completed projects

NNPC

Construction and Installation of 11,000 Us GPM firewater pump at Ologbo Gas Handling Facility of NNPC with Network Oil and Gas Benin

LarfargeHolcim Mfamosing Plant

Procurement and Installation of 2.5tons Donati Wire Rope Hoists at LarfargeHolcim Mfamosing Plant

Sea Gold Nigeria Limited

Post IP repair work at 8” Pipeline at Oyibo new Direct Line pipeline Subcontracted by Sea Gold Nigeria Limited
Residential Building at Oba-Ile Akure
Rebisi Hotel at GRA Port Harcourt
Road Work at Benin
Water Fountain at Oba-Ile Akure
Factory Building for DADTCO Processiong Plant, Afam, Rivers State
Turbine Maintenance Workshop and Turbine Shelter at 1,074 Mega Watts Gas Turbine at Alaoji, Abia State
Multi-Level Event Center at Woji Road, GRA, Port Harcourt
Event Center at Woji Road GRA Port Harcourt
Dome Construction for Catholic Church Sabongida Ora, Edo State
Industrial Complex for CB Geophysical Solution Ltd
Road Project in Owo, Ondo State
Hobark International Office Complex